Deck Framing for a 10×12 Deck

Framing a 10×12 deck takes about 8 joists (16" OC), a doubled beam and ledger along 10', 3 posts, and 8 joist hangers. Change the span and spacing below.

Joists needed
8 joists
Joists
8 pieces12' span at 16" on-center
Beam & ledger
30 lin ftdoubled beam + ledger along 10'
Posts
3 posts6×6 PT, ~8' spacing
Joist hangers
8 each
Framing cost (est.)
$386lumber + hardware, excl. footings