Honey-Do Squad mascotHoney-DoSquadMy Projects

Roofing Calculator

Shingle bundles for a simple roof. Use footprint dimensions including overhangs and a pitch of at least 2/12; complex roofs need separate sections.

01 / YOUR MEASUREMENTSUpdate any value
Shingle bundles
45 bundles
Roof area
1,342 sq ft1,200 sq ft footprint × 6/12 pitch
Roofing squares
13.4 squares1 square = 100 sq ft
Shingle bundles
45 bundles3 bundles/square + 10% waste; check bundle coverage
Underlayment
4 rolls30# felt, 400 sq ft/roll before overlaps; confirm product coverage
Shingle cost (est.)
$1,485$33/bundle sample price
How this estimate works

For a simple roof with one pitch, area = footprint including overhangs × √(1 + (pitch ÷ 12)²). Bundles = area ÷ 100 × 3 × your waste factor, rounded up. Check your product: bundle coverage varies. Price is an editable sample, not a local quote.

This tool is for asphalt shingles at 2/12 pitch or steeper. Between 2/12 and 4/12, special underlayment is required and the standard felt allowance is excluded. GAF low-slope application guidance.

Starter, drip edge, and ridge cap assume a simple gable with a ridge along the length. Underlayment roll coverage is before overlaps. Valleys, dormers, flashing, ice barriers, tear-off, labor, and complex roof geometry need a separate takeoff.

Planning estimate. Adjust allowances and sample prices for your supplier; tax, delivery, and labor are not included.

For contractors: take the next step with Job Ready IQ.
Explore estimating tools for your business from the team behind Honey-Do Squad.
Explore Job Ready IQ →

Re-shingling a roof is doable for a fit, careful DIYer on a simple roof — but it is genuinely dangerous work and unforgiving of leaks. The difference between a 25-year roof and a callback is the underlayment, flashing, and nailing, not the shingles themselves.

DifficultyAdvanced
TimeA long weekend for a small, simple roof with a crew
SkillsComfortable working at height with fall protection; steep or complex roofs are a job for pros
PermitsRe-roofing almost always requires a permit and an inspection, and codes limit how many shingle layers are allowed.

Tools you'll need

Step by step

  1. Tear off and inspect Strip old shingles down to the deck and inspect for soft or rotten sheathing — replace any bad decking before going further.
  2. Drip edge, then underlayment Install drip edge at the eaves, then ice-and-water shield at the eaves and in valleys, with felt or synthetic underlayment over the field.
  3. Lay a starter course Run a starter strip along the eaves so the first shingles seal and resist wind uplift.
  4. Shingle up with the right offset Work up the roof keeping the manufacturer's offset and exposure, snapping chalk lines to stay straight. Nail in the nail zone — not too high, not overdriven.
  5. Flash and cap Flash all penetrations, walls, and valleys (new flashing, not reused), then finish with ridge-cap shingles.

Common mistakes

Nailing too high or overdriving nails
Nails must hit the shingle's nail line and sit flush, not cut through — high or blown nails cause blow-offs and leaks.
Skipping ice-and-water shield
Eaves and valleys need a self-adhering membrane to stop ice dams and valley leaks.
Reusing old flashing
Flashing is where most roofs leak. Replace step, valley, and penetration flashing with the new roof.
Working without fall protection
Use a harness, rope, and roof jacks. No roof is worth a fall.

Safety

Frequently asked questions

How many shingle bundles do I need?
Enter your roof footprint and pitch above — the calculator returns squares and bundles (assuming 3 per square) with an editable waste allowance, 10% by default. Standard felt is excluded below 4/12 pitch because a specified low-slope system is needed. Check product coverage and complex roof sections separately.
Can I shingle over the old roof?
Sometimes one layover is allowed, but a full tear-off lets you fix the deck and flashing and lasts longer. Check local code for layer limits.
Should I DIY my roof?
Only a simple, low-slope roof with proper fall protection. Steep, tall, or complex roofs — and anything you're unsure about — are worth hiring out.

Next steps for this project

Sources & references

Popular Roofing sizes