Pool Planner Lite

Sketch the pool. Plan the whole project.

Choose a pool system and shape to estimate water, excavation, base/backfill, deck area, materials, hired-work allowances, and inspection gates. No account required.

Planning estimate
not engineered plans
Professional review pending. This new planner is available for testing but is excluded from search indexing and the sitemap until its estimating assumptions and safety copy are signed off.
Pool footprint previewA planning template that updates with the selected pool shape and dimensions. 32.0 ft 16.0 ft 3.5–8.0 ft deep
Edit planning rates

Your planning snapshot

Water volume
22,023 gal
Pool footprint
512 sq ft
Perimeter / coping
96.0 linear ft
Excavation to haul
241.9 loose CY (21 loads)
Surrounding deck
448 sq ft
Planning materials
$20,199

Materials and site allowances

Initial pool water
22 1,000 gal
$264
Excavation and haul allowance21 truckloads at 12 CY each
242 loose cu yd
$5,806
Pool deck surface allowanceIncludes 10% cuts/waste; switch to the concrete or paver calculator for a detailed assembly.
493 sq ft
$3,942
Pool floor base allowanceUse only the mix and thickness specified by the kit plans.
3.9 cu yd
$1,021
Concrete wall collar allowanceDimensions are preliminary; approved kit plans control.
5.1 cu yd
$973
Approved backfill
97 tons
$5,603
Pool plumbing planning allowanceFinal pipe size and layout require a hydraulic/equipment plan.
184 linear ft
$690
Coping allowance
106 linear ft
$1,901

Pool-system and professional allowances

Vinyl pool kit, liner, walls, steps, pump, and filter
Professional allowance
$15,360–$28,160
Licensed electrical/bonding and equipment startup
Professional allowance
$2,200–$6,000
Early project range$37,759–$54,359Editable planning allowances, not a quote. Permits, design, access, soil, groundwater, utilities, options, taxes, and local labor can change the total.

Warnings

  • Planning estimate only — approved plans, the pool manufacturer, local code, and site conditions control final quantities.
  • Confirm setbacks, easements, barriers, drainage, utilities, permits, and inspection stages before ordering or digging.

Inspection gates

  • Planning/zoning approval and utility locate before excavation
  • Barrier, gate, alarm, and final safety inspection before use
  • Licensed electrical and equipotential-bonding inspection before equipment startup
  • Wall-panel, collar, underground plumbing, and bonding inspections before backfill
NEED A HAND?

Find help for this project

Check for a contractor serving your project location. Your calculator stays free wherever you live.

Optional. Your ZIP stays in this tab and is not sent to analytics. Availability is based on approximate ZIP locations; confirm your address with the contractor.

Postal data: GeoNames · CC BY 4.0.

Turn the estimate into a build plan

Safety and methodology sources