Honey-Do Squad mascotHoney-DoSquadMy Projects

Gravel for a 10×20 Area at 3" Deep

Covering a 10×20 area 3 inches deep takes about 2.5 tons of gravel (1.85 cubic yards). Change the size or depth below — driveways usually run 4–6".

01 / YOUR MEASUREMENTSUpdate any value
Gravel needed
2.5 tons
Area
200 sq ftat 3" deep
Gravel needed
2.5 tons1.85 cubic yards
Delivered cost (est.)
$113~$45/ton crushed gravel

Planning estimate. Adjust allowances and sample prices for your supplier; tax, delivery, and labor are not included.

BEYOND THE MATERIALS

Make it a complete project

Check the steps, tools, and DIY difficulty before you shop. Your calculator results can be added to My Projects above.

NEED A HAND?

Find help for this project

Check for a contractor serving your project location. Your calculator stays free wherever you live.

Optional. Your ZIP stays in this tab and is not sent to analytics. Availability is based on approximate ZIP locations; confirm your address with the contractor.

For contractors: take the next step with Job Ready IQ.
Explore estimating tools for your business from the team behind Honey-Do Squad.
Explore Job Ready IQ →

Other sizes