How Much Topsoil for 300 Square Feet?
Spreading topsoil over 300 sq ft at 2 inches takes 1.78 cubic yards — about 65 bags, or much cheaper in bulk. Adjust below for a new lawn (4–6") vs top-dressing (1–2").
Topsoil needed
1.78 cu yd
Area
289 sq ftat 2" deep
Topsoil needed
1.78 cubic yards48 cubic feet
0.75-cu-ft bags
65 bagsbulk is far cheaper above ~1 CY
Bulk cost (est.)
$62~$35/CY delivered vs $228 bagged
Doing this for work? Estimate the whole job in minutes.
JRIQ turns plans and site photos into full material + labor estimates with AI — built by the team behind these calculators.
Try it free →
How this is calculated
Mulch volume = bed area × depth. We convert cubic feet to cubic yards for bulk delivery and to 2-cu-ft bags for the bagged option, so you can compare cost both ways.